Wednesday, October 26, 2011

We've got a roof!

     Jim, Matt and I arrived at trout camp Saturday evening after a 3.25 hour drive.  The additional drive time was due to a stop over in Oil City to pick up 400square feet of Owens Corning Ice/Water Guard Roof Membrane from our eventual metal roof supplier.  Greg was nice enough to bring the rolls home with him and allow us to pick it up at his place after hours.  Way after hours, around 10:15-ish if memory serves correctly.  From there we took the 30 minute drive into camp.  Our camp entry was marked with the usual ritual of unpacking and preparing the sleeping arrangements, unloading the tools, ladders and gear from the trailer and SUV into the "Thinker's Box" and situating things so that we could enjoy some grub (or breakfast as Matt liked to refer to it because of the past midnight hour).  It was a cold night (mid 30 degrees) with an almost clear sky full of stars.  Just outside the perimeter of camp, small scurries and rustling leaves could be heard.  What was a bit unnerving and startling at first was the pack of coyotes that began howling, crying and whining off in the distance.  It sounded like there were quite a few of them, with definitely some offspring in the mix as well.  That had us on an elevated alertness level for a while.

     Matt continued to prep the fire, burning almost all of the untreated dimensional lumber cut offs that were scattered about, and I put the burgers, hot dogs and buns on the propane grill.  We'll need to acquire a replacement soon, the few months of elements (even while under a full sized cover) have frozen the burner temp. adjustment knobs internally and screwed with the gas delivery to the burner itself.  I was able to fire up one side and cook, but it was slow going due to a reduced output.  After we chowed down and have a few refreshments, it was time for lights out.  We slept protected from the elements, but it was till cold, inside my neighbor's cabin.

     Sunday morning began by following the lead and direction of my neighbor Matt.  The goal was to install the roof on the "Thinker's Box".  Matt and I took the high ground.  We were supported by Jim on the lower level.  Not having to climb up and down the step ladder, back and forth from the loft to the first floor, to make cuts was a real time and energy saver!

     It took about an hour.  In that time, we were able to block in the end of the roof rafters. When the OSB sheeting was installed over top of the rafters, the short end walls at the eaves aren't exposed to the outside.  With a few tubes of caulk or liquid nails, we'll have a great seal at the inside eaves.  We'll save that for next time!

     Once all the rafter ends were blocked in, Matt and I moved to the next task- - installing the extensions that comprise the support arms for the eave overhang on the north and south end of the tool shed.  We notched back two rafters and ran a 2"X4" through the notches extending 10.5" out from the face of the walls.  The end of the 2"X4" 's were screwed to the vertical side of a third rafter in to complete the connection to skeletal frame.  On the extension side, we butted a vertical length of 2"X4" to the horizontal protruding piece and screwed it together securely.  Once the .60" OSB was installed on top, the extensions became strong enough to hang from and aren't likely to sag in my lifetime.  I appreciate the abilities of Matt, because as we brainstormed the design together, the plan that we came up with seemed to work out extremely well and looks good too!

     We ran into some issues with our borrowed generator.  Thankfully it was half way through laying the roof decking in place.  As we began work on the long side of the roof, Adam's homelite generator began to run really rough.  I raced down from the loft to it to see if I could mess with the choke, because it sounded like it had begun to flood out or something...but, I wasn't quick enough.  By the time I got close, it had turned off and could not be restarted.  This reduced building efficiency to a snails pace.  Cuts, thankfully there weren't a ton of them to do, had to be made using the electricity available at the neighbor's camp.  Four trips back and forth completed the decking.  Nailing, remember we were using pneumatic tools for this part, had to resume via hand tools.  Matt and I cut the collated clipped head nails into singles and put in as many as we had time to do.  Eventually, by hand, the roof was as finished as it could possibly be on this trip out.  Another half hour to 45 minutes was spent getting the camouflage tarp up and over the roof and stapled into place.

So, what's in store for the next trip out?

     The fascia board has not been installed, nor has the Owens-Corning Ice / Water Guard.  These two tasks have been reserved for the next trip up as we simply ran out of time and daylight this time around.  I guess I'll bring up the caulk gun and seal in the loft blocking on that trip as well...

     I would like to once again extend an enormous level of gratitude and a huge "THANK YOU!" to my neighbor Matt for assisting Jim and I in this endeavor.  Without exaggeration, there is no way (NONE!) that the "Thinker's Box" would be at this level of completion without his help.  Help isn't really the word I feel comfortable using either...  What he has done for our camp is above and beyond what I would expect from anyone that volunteers to "lend a hand" to a friend.  I don't wish to go on and on about this, but I am indebted to him and his time which I realize is extremely valuable.  To be completely honest, I feel an extreme level of humbleness and a certain level of anxiety regarding what he has done for us thus far because I somehow feel we don't deserve it.  I promise that I'll return the favor when the time(s) comes and the call is placed!

That's all for now...enjoy the movie!


Friday, October 14, 2011

Putting the finishing touches on the Thinker's Box framing...

This past Wednesday, after celebrating my daughter's 14th b-day at our favorite sushi restaurant (Otani's in Mayfield Heights), I immediately headed out to TC in preparation for the following day's list of things to do.  The rush is the weather.  If you haven't had the opportunity to spend a few overnighters in Pennsylvania, let me clue you in...Whatever the nightime temperature is in Cleveland, it'll be 10-15 degrees cooler in the Allegheny Mountains.  If it is borderline cold here with an occasional sprinkle of snow, chances are they'll have 12-24" on the ground in parts.  They seem to have rain every third day, so you can imagine what happens when freezing temperatures become common.  Now, this isn't a given, but considered typical.  My fear is the snow that lurks just around the corner and the unfinished state of the Thinker's Box "shed".  It must at least have a solid roof (even if it is just the sheathing) prior to the white stuff.  When the snow starts flying, the loads will easily weigh down the tarp that is on it now and tear it to shreds.  If that happens, the affects on the interior could prove catastrophic destroying the progress that I've worked so hard to complete in such a short time.  So, in short...the roof needs to be installed!  If we can get the sheathing on the roof rafters and at least one wall skinned (the northern facing wall) before the snow starts to fly my level of anxiety will be greatly reduced.

As you will see in the video, the OSB is at camp ready to be installed, all of the rafters are in place and the walls now have been made structurally sound with in-between-the-studs 45 degree angle blocking.  I've also managed to bring the studs up to the underside of the outer roof rafters.  The only thing that needs to be addressed before the roof decking is put in place is the eves.  I'd like to extend them a foot on either end to give us a lip of protection against the elements.


As far as camp is concerned.  It looks like we've had no human visitors since my last visit.  The plastic that I stapled to the walls was intact and untouched.  I didn't see any footprints in the lower level's flat either.  The grass is still growing and I believe the seed that was laid about a month ago (if memory serves correctly) has sprouted with the most success.  So, late September seems to be a good time.  I'm guessing that we'll have to go through this routine several times before we have a nice lush area that is completely green a portion of the year.  I can't help but think that a couple falls worth of leaf debris and natural decomposition would go far in providing the nutrients necessary to hardy up the grass we have...time will tell, I guess.

Tuesday, October 11, 2011

Cool Photos From Camping w/The Neighbors

     Since I was too busy to shoot any sort of quality video programming to post of camping with the neighbors, I asked for copies of Carol's photography.  Here are a few (more than a few) of the cooler ones of the time we spent with weapons of war and target practice at Trout Camp back in September.

     But, first...before play time, there is always work.  I proposed a game of "pick up the rocks".  The one with the most amount of rocks collected withing their bucket in a 5 minute period of time (it was more like 10 - I think?) wins $10 cash!   My neighbor's children were all on board and the competition was fierce.  There wasn't just one bucket per kid, they collected many buckets each.  I was amazed at their enthusiasm! When the timer went off and it was time to count the tons of rocks collected and redistributed to the drive-path into camp, I discovered they all had tied! Imagine that?!  So, everyone got paid the prize award amount.  Best $30 that Jim and I ever spent.  These kids know how to work and they did a great job of clearing the rocks off the lower flat of our property.  We've got more to do, however, and there is always next time and another competition! LOL!

     After the work was completed,  we prepped a spot on the lower level and prepared the arsenal for firing.  You may notice, by my shirt, that it was HOT!  Anyway, I went over gun safety, range awareness, properly body position and stance, safe trigger finger placement, announcing safety on/off, the range was "hot", live firing, etc... We began with the bb rifle and CO2 handgun and worked our way through to the Glock.  Matt and I had some fun firing his old shot gun and I took out my rifle as well.  The best part of the event was seeing how much the kids enjoyed themselves.  I know that they appreciated the challenge of target practicing and attempting to remove the red dot of the bull's eye from the targets.  Look at the smile on "Not-a-Toyota's" face in the .gif below.  She was brave enough and had no problem going through a complete magazine of rounds in the process.  I was impressed by how well she followed instructions, her patience, and how well she hit the target. This particular model is a first generation, it is wide, it kicks with a passion, but she handled it in stride.  Maybe she'll grow up to be a law enforcement officer?  Who knows!?

I think the smiles says it all!  There is nothing like firing a .40cal glock!

Some of the crew decided that Mankala was more fun than shooting, but that's OK...Trout Camp is supposed to be about having fun and good memories.  
For their first time ever handling a firearm, I'd say that what they shot was really impressive!
It wasn't just kids proving they had good aim, the adults got in on the action as well!

Everyone got a chance to shoot the BB gun, .22 Rifle, and a few others...

Replenishment of my neighbor's water supply at our local spring.


Gun / Range Safety Instruction Speech

Unloading the weapons, before the safety speech.

Rock Collection Time!

"Not-a-Toyota", first time with a long rifle and a great shot!