My day began at 7am and the work was non-stop until just after 6pm. In that time, trim was added on the top edge of each long wall, under the rake eaves to fill the gaps, two window openings were cut, framed, installed and painted and wood caps were added to the end of the rakes to cover the holes.
This coming Tuesday the aluminum fascia cladding will be ready for pick up and plans call for me to install them on Wednesday. At that point, save some more caulking and another coat of paint, which will happen on the next clear day with warm sunlight, the exterior of the "Shed Mahal" will be done!
I'm looking forward to this day because at that point I can turn my attention to the Banner camper's needs which include a new roof and closure of wall portals left behind when the refrigerator and furnace were removed. This work can and will be done at home in my driveway which is a relief I'm looking forward too!
Thanks for keeping up with the blog and encouraging me with your words and emails. I've needed it. It has been a long and laborious journey. This was a challenge that took a lot out of me, but I made it. What I've been able to construct alone and with the help of others here and there along the way is quite impressive. The days where we can travel to camp and only worry about a little yard work and cleaning are fast approaching and I can't wait until the fun times, camping and enjoying the outdoors with family and friends, begin.