In a slight change of pace, I chose to sleep at home and make my trek up to camp in the cover of darkness in the early morning hours of Wednesday. And, since we're doing something different, I did most of my driving on route 6 east into camp. It took about 25 minutes longer, but I figured "What the heck?!" The wheels stopped turning around 8:45 and I methodically unloaded the SUV. Let's face it, I've done this enough times that I should have a doctorate. After putting the stolen sleeping bag back into Pedro's cabin, sometimes you've got to keep an eye on your friends and their sticky fingers, I strung the power to the Shed Mahal and got to work. In just a few hours, I had attached the final sheet of T1-11 for the first level, filled in the two areas with 3-4" scabs where the width of the cabin was wider than 12', router the door openings for both the roll door and 36" entrance door and filled in the South side peak with T1-11 cut to fit. A big thank you to Shawn's Dad Ray for providing the router bit that made the creation of the door openings match perfectly to the stud framing that was in place behind the exterior panels.
What's left?
- Install the roll door
- Install the entrance door / screen door
- Paint
- Install the metal roof
- Frame & install the (3) small windows
- Trim frame the exterior corners, doors and wall seams
- Install the trim panels for the ridge rake and eaves
- Install the faux board and batten look every 16" across all walls.
- Caulk where needed
- Repaint the trim
Many of the things on the list can't be done until spring or at least until much warmer temperatures. So, one more trip to complete the North wall's peak panels and we're done until spring. This will free up time for me to bring the solid wood floor I acquired up to installation ready condition. I can do this at home where it is much more convenient.