It had always been my goal to reuse/recycle as much building materials as possible. Through friends (Greg’s lumber donations were a G_dsend) and craig’s list…I was able to save quite a bit. I thought I was maintaining this goal when I acquired the 36” solid wood entrance door complete with screen/glass door for $35. Replacing the threshold with a beautiful hickory duplicate through Millwork Design Solutions bumped the total investment to $75 which would have still stuck with the theme to miser out the cost of the build. However, I was plagued with how much manipulation was required to force this old, tired door to operate within the Shed-Mahal. And, when I was finished (the previous post) with its installation, it didn’t fit “perfect”. The gaps around the frame / door and frame / rough opening would require more time, labor and additional weather stripping to seal the inside from the outside. The wheels of thought and more accurately reason began to paint a picture that maybe it would be better to rewind and begin again. If you’ve stuck with me along this journey and watched the way we’ve constructed this structure from start to finish, this door was a black sheep of all the other steps that we’ve completed up to this point.
After discussing my displeasure with my partner Floatman Jim, it was decided that we’d just replaced the old-new door with a new-new door bought from the big box store. Yesterday, I spent the better part of the day up at camp extracting the CL wood model and replacing it with a weather tight and brand-spanking-new metal entrance version.
The removal of the wood door went surprisingly fast due to the bi-metal blade attached to my Porter Cable tiger saw. Not to go off on a tangent, but this professional power tool was purchased the year we bought our home and has been a faithful and durable work horse that has not seen a material bond it couldn’t chew through at break neck speeds. Takes off skin and flesh quickly too, but don’t they all? LOL! Anyway, five minutes flat and the old door was out and I was cleaning up the rough opening for the new replacement. Following the instructions meticulously, a generous amount of caulk was applied where specified (which was practically everywhere). The instructions went as far as saying, “This step requires an entire tube of caulk!” I found that funny, they weren’t kidding either. About an hour later, the door was installed, it was closing without rubbing, without visible perimeter gaps and with an excellent seal. Another hour later and I had the locksets in and the aluminum framing for the screen door in place. Another hour (we’re into the third hour now) and the “manipulation” of the screen door had it returned to practically factory new. I repaired some of the hinges that were bent and replaced some screws that were either missing or mangled. Finishing up the third hour and into the fourth had an entire new set of hardware installed including the handle assembly, return piston and safety springs. The job finished up with setting the glass panels back in place and adjusting the return piston to close at an appropriate speed.
What’s left on “Things To Do List”?
Interior-
- Maple Floor
- Linoleum Loft Floor
- Loft Ladder
- Insulating
Exterior-
- Metal Roof
- Painting
- Edge Trimming
- Painting
- Eave Trimming
- Windows
- Entrance Wall Extension Deck
- Entrance Door Stairs
- Roll Door Entrance Ramp
I was able to reduce the usual 50 minutes of setup time to 35 minutes of take down through efficient use of my back and forth trips to the SUV with tools and flying through the 200’ of electrical cord manual winding. It was target practice time and I was ready to have a little fun and filming. The rest is documented in the video clip attached. Enjoy!